Penmann successfully delivered a tailored HVAC upgrade at Nutricia’s Liverpool facility, providing a fully engineered ventilation and climate control system designed to satisfy strict hygiene and production standards. The scope included the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://myeasybookmarks.com/story6246182/the-penmann-team-delivers-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-supporting-fsi-phase-1-2